{"id":83323,"date":"2026-10-30T15:03:45","date_gmt":"2026-10-30T09:33:45","guid":{"rendered":"https:\/\/www.iquanta.in\/blog\/?p=83323"},"modified":"2026-10-30T15:04:05","modified_gmt":"2026-10-30T09:34:05","slug":"iim-lucknow-rti-data-2026","status":"publish","type":"post","link":"https:\/\/www.iquanta.in\/blog\/iim-lucknow-rti-data-2026\/","title":{"rendered":"IIM Lucknow RTI Data 2026: Composite Score Cutoff, Shortlisted Candidates &#038; More"},"content":{"rendered":"\n<p>The IIM Lucknow RTI Data 2026 shared details about the category-wise MBA admission process for the 2026-28 batch based on CAT 2025 scores. The data consists of composite score cutoffs, candidates shortlisted for WAT-PI and more that leads to final admission offers at IIM Lucknow. This data helps the IIM Lucknow MBA aspirants to understand about the selection criteria as well as number of candidates who apply for PGP each year. Get further details in this blog.\u00a0<\/p>\n\n\n\n<p><strong><em><mark>Join iQuanta\u2019s diversified student community for free and prepare with other 4.1L+ peers. Get access to 24*7 doubt-solving, mentorship, free webinars, etc., all at one single platform<\/mark><\/em><\/strong>.<\/p>\n\n\n\n<figure class=\"wp-block-image\"><a href=\"https:\/\/li.iquanta.in\/3FagB\"><img fetchpriority=\"high\" decoding=\"async\" width=\"640\" height=\"171\" src=\"https:\/\/www.iquanta.in\/blog\/wp-content\/uploads\/2026\/05\/CATBLOGBANNER.png\" alt=\"\" class=\"wp-image-75698\" srcset=\"https:\/\/www.iquanta.in\/blog\/wp-content\/uploads\/2026\/05\/CATBLOGBANNER.png 640w, https:\/\/www.iquanta.in\/blog\/wp-content\/uploads\/2026\/05\/CATBLOGBANNER-300x80.png 300w, https:\/\/www.iquanta.in\/blog\/wp-content\/uploads\/2026\/05\/CATBLOGBANNER-150x40.png 150w\" sizes=\"(max-width: 640px) 100vw, 640px\" \/><\/a><\/figure>\n\n\n\n<div id=\"ez-toc-container\" class=\"ez-toc-v2_0_77 counter-hierarchy ez-toc-counter ez-toc-grey ez-toc-container-direction\">\n<div class=\"ez-toc-title-container\">\n<p class=\"ez-toc-title\" style=\"cursor:inherit\">Table of Contents<\/p>\n<span class=\"ez-toc-title-toggle\"><a href=\"#\" class=\"ez-toc-pull-right ez-toc-btn ez-toc-btn-xs ez-toc-btn-default ez-toc-toggle\" aria-label=\"Toggle Table of Content\"><span class=\"ez-toc-js-icon-con\"><span class=\"\"><span class=\"eztoc-hide\" style=\"display:none;\">Toggle<\/span><span class=\"ez-toc-icon-toggle-span\"><svg style=\"fill: #999;color:#999\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" class=\"list-377408\" width=\"20px\" height=\"20px\" viewBox=\"0 0 24 24\" fill=\"none\"><path d=\"M6 6H4v2h2V6zm14 0H8v2h12V6zM4 11h2v2H4v-2zm16 0H8v2h12v-2zM4 16h2v2H4v-2zm16 0H8v2h12v-2z\" fill=\"currentColor\"><\/path><\/svg><svg style=\"fill: #999;color:#999\" class=\"arrow-unsorted-368013\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"10px\" height=\"10px\" viewBox=\"0 0 24 24\" version=\"1.2\" baseProfile=\"tiny\"><path d=\"M18.2 9.3l-6.2-6.3-6.2 6.3c-.2.2-.3.4-.3.7s.1.5.3.7c.2.2.4.3.7.3h11c.3 0 .5-.1.7-.3.2-.2.3-.5.3-.7s-.1-.5-.3-.7zM5.8 14.7l6.2 6.3 6.2-6.3c.2-.2.3-.5.3-.7s-.1-.5-.3-.7c-.2-.2-.4-.3-.7-.3h-11c-.3 0-.5.1-.7.3-.2.2-.3.5-.3.7s.1.5.3.7z\"\/><\/svg><\/span><\/span><\/span><\/a><\/span><\/div>\n<nav><ul class='ez-toc-list ez-toc-list-level-1 ' ><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-1\" href=\"https:\/\/www.iquanta.in\/blog\/iim-lucknow-rti-data-2026\/#What_Is_IIM_RTI_Data_2026\" >What Is IIM RTI Data 2026?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-2\" href=\"https:\/\/www.iquanta.in\/blog\/iim-lucknow-rti-data-2026\/#Number_of_Candidates_Who_Expressed_Interest_in_IIM_Lucknow_PGP_2026\" >Number of Candidates Who Expressed Interest in IIM Lucknow PGP 2026\u00a0<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-3\" href=\"https:\/\/www.iquanta.in\/blog\/iim-lucknow-rti-data-2026\/#Number_of_Candidates_Who_Qualified_Based_on_Stage_1a_Criteria_at_IIM_Lucknow\" >Number of Candidates Who Qualified Based on Stage 1a Criteria at IIM Lucknow<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-4\" href=\"https:\/\/www.iquanta.in\/blog\/iim-lucknow-rti-data-2026\/#IIM_Lucknow_Composite_Score_Cutoff_2026\" >IIM Lucknow Composite Score Cutoff 2026\u00a0<\/a><ul class='ez-toc-list-level-3' ><li class='ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-5\" href=\"https:\/\/www.iquanta.in\/blog\/iim-lucknow-rti-data-2026\/#MBA_Programme\" >MBA Programme<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-6\" href=\"https:\/\/www.iquanta.in\/blog\/iim-lucknow-rti-data-2026\/#MBA-ABM_Programme\" >MBA-ABM Programme<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-7\" href=\"https:\/\/www.iquanta.in\/blog\/iim-lucknow-rti-data-2026\/#MBA-SM_Programme\" >MBA-SM Programme<\/a><\/li><\/ul><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-8\" href=\"https:\/\/www.iquanta.in\/blog\/iim-lucknow-rti-data-2026\/#IM_Lucknow_Final_Selection_Criteria_Post-PI\" >IM Lucknow Final Selection Criteria (Post-PI)\u00a0<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-9\" href=\"https:\/\/www.iquanta.in\/blog\/iim-lucknow-rti-data-2026\/#IIM_Lucknow_Category-wise_Final_Admission_Offers\" >IIM Lucknow Category-wise Final Admission Offers<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-10\" href=\"https:\/\/www.iquanta.in\/blog\/iim-lucknow-rti-data-2026\/#IIM_Lucknow_Number_of_Shortlisted_Candidates_for_WAT-PI_Across_Programmes\" >IIM Lucknow Number of Shortlisted Candidates for WAT-PI Across Programmes<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-11\" href=\"https:\/\/www.iquanta.in\/blog\/iim-lucknow-rti-data-2026\/#Conclusion\" >Conclusion<\/a><\/li><\/ul><\/nav><\/div>\n<h2 class=\"wp-block-heading\" id=\"h-what-is-iim-rti-data-2026\"><span class=\"ez-toc-section\" id=\"What_Is_IIM_RTI_Data_2026\"><\/span><strong>What Is IIM RTI Data 2026?<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p>The IIMs disclose the admission related information under the Right to Information Act. IIM RTI data 2026 has been shared for the batch of 2026-28 covering the CAT 2025 cycle. This data depicts how many candidates showed interest, cleared the cutoff marks and called for the interview process.&nbsp;<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"h-number-of-candidates-who-expressed-interest-in-iim-lucknow-pgp-2026\"><span class=\"ez-toc-section\" id=\"Number_of_Candidates_Who_Expressed_Interest_in_IIM_Lucknow_PGP_2026\"><\/span><strong>Number of Candidates Who Expressed Interest in IIM Lucknow PGP 2026\u00a0<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p>The following table shows the number of candidates who expressed interest in pursuing MBA programme at IIM Lucknow. The given table shows the candidates who applied for MBA, MBA ABM and MBA SM.&nbsp;&nbsp;<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><tbody><tr><td><strong>Category<\/strong><\/td><td><strong>MBA<\/strong><\/td><td><strong>MBA\u2010ABM<\/strong><\/td><td><strong>MBA\u2010SM<\/strong><\/td><\/tr><tr><td><strong>General<\/strong><\/td><td>152,584<\/td><td>114,281<\/td><td>116,138<\/td><\/tr><tr><td><strong>EWS<\/strong><\/td><td>13,899<\/td><td>12,176<\/td><td>12,125<\/td><\/tr><tr><td><strong>NC\u2010OBC<\/strong><\/td><td>44,127<\/td><td>36,667<\/td><td>36,755<\/td><\/tr><tr><td><strong>SC<\/strong><\/td><td>19,486<\/td><td>15,094<\/td><td>15,148<\/td><\/tr><tr><td><strong>ST<\/strong><\/td><td>5,018<\/td><td>3,691<\/td><td>3,675<\/td><\/tr><tr><td><strong>PwD<\/strong><\/td><td>1,113<\/td><td>804<\/td><td>802<\/td><\/tr><tr><td><strong>Total<\/strong><\/td><td><strong>236,227<\/strong><\/td><td><strong>182,713<\/strong><\/td><td><strong>184,643<\/strong><\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"h-number-of-candidates-who-qualified-based-on-stage-1a-criteria-at-iim-lucknow\"><span class=\"ez-toc-section\" id=\"Number_of_Candidates_Who_Qualified_Based_on_Stage_1a_Criteria_at_IIM_Lucknow\"><\/span><strong>Number of Candidates Who Qualified Based on Stage 1a Criteria at IIM Lucknow<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<figure class=\"wp-block-table\"><table><tbody><tr><td><strong>Category<\/strong><\/td><td><strong>MBA<\/strong><\/td><td><strong>MBA\u2010ABM<\/strong><\/td><td><strong>MBA\u2010SM<\/strong><\/td><\/tr><tr><td><strong>General<\/strong><\/td><td>7,024<\/td><td>8,127<\/td><td>1,914<\/td><\/tr><tr><td><strong>EWS<\/strong><\/td><td>879<\/td><td>1,083<\/td><td>119<\/td><\/tr><tr><td><strong>NC\u2010OBC<\/strong><\/td><td>2,084<\/td><td>2,469<\/td><td>521<\/td><\/tr><tr><td><strong>SC<\/strong><\/td><td>2,193<\/td><td>1,691<\/td><td>339<\/td><\/tr><tr><td><strong>ST<\/strong><\/td><td>530<\/td><td>397<\/td><td>77<\/td><\/tr><tr><td><strong>PwD<\/strong><\/td><td>210<\/td><td>145<\/td><td>25<\/td><\/tr><tr><td><strong>Total<\/strong><\/td><td><strong>12,920<\/strong><\/td><td><strong>13,912<\/strong><\/td><td><strong>2,995<\/strong><\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"h-iim-lucknow-composite-score-cutoff-2026\"><span class=\"ez-toc-section\" id=\"IIM_Lucknow_Composite_Score_Cutoff_2026\"><\/span><strong>IIM Lucknow Composite Score Cutoff 2026\u00a0<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p>The IIM Lucknow composite scores for the candidates who have qualified stage 1 has been given in the table below for MBA, MBA ABM and MBA SM programmes. The minimum composite score (cut-off) to qualify for Writing Ability Test and Personal Interview (WAT-PI), maximum composite score, and the number of candidates shortlisted for WAT-PI are as follows.&nbsp;<\/p>\n\n\n\n<h3 class=\"wp-block-heading\" id=\"h-mba-programme\"><span class=\"ez-toc-section\" id=\"MBA_Programme\"><\/span><strong>MBA Programme<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<figure class=\"wp-block-table\"><table><tbody><tr><td><strong>Category of the candidate<\/strong><\/td><td><strong>Max Composite Score<\/strong><\/td><td><strong>Min Composite Score (Cut-off)<\/strong><\/td><td><strong>Shortlisted Candidates<\/strong><\/td><\/tr><tr><td><strong>General<\/strong><\/td><td>71.5371374<\/td><td>49.8496132<\/td><td>1,268<\/td><\/tr><tr><td><strong>EWS<\/strong><\/td><td>64.0679612<\/td><td>37.6675938<\/td><td>312<\/td><\/tr><tr><td><strong>NC\u2010OBC<\/strong><\/td><td>74.6631356<\/td><td>35.9811591<\/td><td>910<\/td><\/tr><tr><td><strong>SC<\/strong><\/td><td>61.6924997<\/td><td>28.9562585<\/td><td>793<\/td><\/tr><tr><td><strong>ST<\/strong><\/td><td>60.0291357<\/td><td>19.1441699<\/td><td>396<\/td><\/tr><tr><td><strong>General-PwD<\/strong><\/td><td>63.7457174<\/td><td>11.1589874<\/td><td>161<\/td><\/tr><tr><td><strong>EWS-PwD<\/strong><\/td><td>42.1602951<\/td><td>22.7107000<\/td><td>6<\/td><\/tr><tr><td><strong>NC\u2010OBC-PwD<\/strong><\/td><td>43.3707247<\/td><td>12.6543792<\/td><td>32<\/td><\/tr><tr><td><strong>SC-PwD<\/strong><\/td><td>46.0253797<\/td><td>18.4221358<\/td><td>10<\/td><\/tr><tr><td><strong>ST-PwD<\/strong><\/td><td>53.8677913<\/td><td>53.8677913<\/td><td>1<\/td><\/tr><tr><td><strong>Total<\/strong><\/td><td>\u2014<\/td><td>\u2014<\/td><td><strong>3,889<\/strong><\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<h3 class=\"wp-block-heading\" id=\"h-mba-abm-programme\"><span class=\"ez-toc-section\" id=\"MBA-ABM_Programme\"><\/span><strong>MBA-ABM Programme<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<figure class=\"wp-block-table\"><table><tbody><tr><td><strong>Category of the candidate<\/strong><\/td><td><strong>Max Composite Score<\/strong><\/td><td><strong>Min Composite Score (Cut-off)<\/strong><\/td><td><strong>Shortlisted Candidates<\/strong><\/td><\/tr><tr><td><strong>General<\/strong><\/td><td>72.8479378<\/td><td>44.6970697<\/td><td>861<\/td><\/tr><tr><td><strong>EWS<\/strong><\/td><td>59.0751248<\/td><td>31.9364462<\/td><td>363<\/td><\/tr><tr><td><strong>NC\u2010OBC<\/strong><\/td><td>60.8794836<\/td><td>32.1105858<\/td><td>753<\/td><\/tr><tr><td><strong>SC<\/strong><\/td><td>60.2291413<\/td><td>22.6539644<\/td><td>694<\/td><\/tr><tr><td><strong>ST<\/strong><\/td><td>52.9990571<\/td><td>8.3563137<\/td><td>397<\/td><\/tr><tr><td><strong>General-PwD<\/strong><\/td><td>58.7457174<\/td><td>9.1876598<\/td><td>107<\/td><\/tr><tr><td><strong>EWS-PwD<\/strong><\/td><td>37.1602951<\/td><td>16.7107000<\/td><td>5<\/td><\/tr><tr><td><strong>NC\u2010OBC-PwD<\/strong><\/td><td>42.6447207<\/td><td>12.9606219<\/td><td>26<\/td><\/tr><tr><td><strong>SC-PwD<\/strong><\/td><td>41.0253797<\/td><td>16.6364898<\/td><td>6<\/td><\/tr><tr><td><strong>ST-PwD<\/strong><\/td><td>48.8677913<\/td><td>48.8677913<\/td><td>1<\/td><\/tr><tr><td><strong>Total<\/strong><\/td><td>\u2014<\/td><td>\u2014<\/td><td><strong>3,213<\/strong><\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<h3 class=\"wp-block-heading\" id=\"h-mba-sm-programme\"><span class=\"ez-toc-section\" id=\"MBA-SM_Programme\"><\/span><strong>MBA-SM Programme<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<figure class=\"wp-block-table\"><table><tbody><tr><td><strong>Category of the candidate<\/strong><\/td><td><strong>Max Composite Score<\/strong><\/td><td><strong>Min Composite Score (Cut-off)<\/strong><\/td><td><strong>Shortlisted Candidates<\/strong><\/td><\/tr><tr><td><strong>General<\/strong><\/td><td>63.2034878<\/td><td>38.9413577<\/td><td>819<\/td><\/tr><tr><td><strong>EWS<\/strong><\/td><td>55.3216163<\/td><td>20.0947982<\/td><td>119<\/td><\/tr><tr><td><strong>NC\u2010OBC<\/strong><\/td><td>56.6936597<\/td><td>17.7939009<\/td><td>521<\/td><\/tr><tr><td><strong>SC<\/strong><\/td><td>53.4301347<\/td><td>12.0471541<\/td><td>339<\/td><\/tr><tr><td><strong>ST<\/strong><\/td><td>51.0291357<\/td><td>12.4993136<\/td><td>77<\/td><\/tr><tr><td><strong>General-PwD<\/strong><\/td><td>49.6977312<\/td><td>11.0173028<\/td><td>21<\/td><\/tr><tr><td><strong>EWS-PwD<\/strong><\/td><td>27.6195239<\/td><td>27.6195239<\/td><td>1<\/td><\/tr><tr><td><strong>NC\u2010OBC-PwD<\/strong><\/td><td>25.3054899<\/td><td>22.9606219<\/td><td>2<\/td><\/tr><tr><td><strong>SC-PwD<\/strong><\/td><td>31.4824604<\/td><td>31.4824604<\/td><td>1<\/td><\/tr><tr><td><strong>ST-PwD<\/strong><\/td><td>\u2014<\/td><td>\u2014<\/td><td>0<\/td><\/tr><tr><td><strong>Total<\/strong><\/td><td>\u2014<\/td><td>\u2014<\/td><td><strong>1,900<\/strong><\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"h-im-lucknow-final-selection-criteria-post-pi\"><span class=\"ez-toc-section\" id=\"IM_Lucknow_Final_Selection_Criteria_Post-PI\"><\/span><strong>IM Lucknow Final Selection Criteria (Post-PI)\u00a0<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p>The final selection of the candidates is based on 100 points. These points are calculated through various weightage such as CAT score, PI, WAT, diversity factor, work experience and academic performance of the candidates. It is mandatory for the candidates to score at least 12 out of 40 marks in the Personal Interview to be eligible for the final merit list.<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><tbody><tr><td><strong>Component<\/strong><\/td><td><strong>MBA Weightage<\/strong><\/td><td><strong>MBA-ABM Weightage<\/strong><\/td><\/tr><tr><td>CAT Score<\/td><td>30<\/td><td>35<\/td><\/tr><tr><td>Personal Interview (PI)<\/td><td>40<\/td><td>40<\/td><\/tr><tr><td>Writing Ability Test (WAT)<\/td><td>10<\/td><td>10<\/td><\/tr><tr><td>Diversity Factor<\/td><td>5<\/td><td>5<\/td><\/tr><tr><td>Work Experience<\/td><td>5<\/td><td>NA<\/td><\/tr><tr><td>Academic Performance (Class 12th marks + Graduation)<\/td><td>5 + 5<\/td><td>5 + 5<\/td><\/tr><tr><td><strong>Total Final Score<\/strong><\/td><td><strong>100<\/strong><\/td><td><strong>100<\/strong><\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"h-iim-lucknow-category-wise-final-admission-offers\"><span class=\"ez-toc-section\" id=\"IIM_Lucknow_Category-wise_Final_Admission_Offers\"><\/span><strong>IIM Lucknow Category-wise Final Admission Offers<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p>As per the IIM Lucknow RTI data, the following number of admission offers were made to the following category of candidates. &nbsp;<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><tbody><tr><td><strong>Category of the candidate<\/strong><\/td><td><strong>Admission offers&nbsp;<\/strong><\/td><\/tr><tr><td>General\/UR<\/td><td>556<\/td><\/tr><tr><td>EWS<\/td><td>121<\/td><\/tr><tr><td>NC-OBC<\/td><td>374<\/td><\/tr><tr><td>SC<\/td><td>217<\/td><\/tr><tr><td>ST<\/td><td>108<\/td><\/tr><tr><td>Open-PwD<\/td><td>57<\/td><\/tr><tr><td>NC-OBC-PwD<\/td><td>12<\/td><\/tr><tr><td>SC-PwD<\/td><td>2<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"h-iim-lucknow-number-of-shortlisted-candidates-for-wat-pi-across-programmes\"><span class=\"ez-toc-section\" id=\"IIM_Lucknow_Number_of_Shortlisted_Candidates_for_WAT-PI_Across_Programmes\"><\/span><strong>IIM Lucknow Number of Shortlisted Candidates for WAT-PI Across Programmes<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<figure class=\"wp-block-table\"><table><tbody><tr><td><strong>Category<\/strong><\/td><td><strong>MBA Shortlisted Candidates<\/strong><\/td><td><strong>MBA-ABM Shortlisted Candidates<\/strong><\/td><td><strong>MBA-SM Shortlisted Candidates<\/strong><\/td><\/tr><tr><td><strong>General<\/strong><\/td><td>1,268<\/td><td>861<\/td><td>819<\/td><\/tr><tr><td><strong>EWS<\/strong><\/td><td>312<\/td><td>363<\/td><td>119<\/td><\/tr><tr><td><strong>NC\u2010OBC<\/strong><\/td><td>910<\/td><td>753<\/td><td>521<\/td><\/tr><tr><td><strong>SC<\/strong><\/td><td>793<\/td><td>694<\/td><td>339<\/td><\/tr><tr><td><strong>ST<\/strong><\/td><td>396<\/td><td>397<\/td><td>77<\/td><\/tr><tr><td><strong>General-PwD<\/strong><\/td><td>161<\/td><td>107<\/td><td>21<\/td><\/tr><tr><td><strong>EWS-PwD<\/strong><\/td><td>6<\/td><td>5<\/td><td>1<\/td><\/tr><tr><td><strong>NC\u2010OBC-PwD<\/strong><\/td><td>32<\/td><td>26<\/td><td>2<\/td><\/tr><tr><td><strong>SC-PwD<\/strong><\/td><td>10<\/td><td>6<\/td><td>1<\/td><\/tr><tr><td><strong>ST-PwD<\/strong><\/td><td>1<\/td><td>1<\/td><td>\u2014<\/td><\/tr><tr><td><strong>Total<\/strong><\/td><td><strong>3,889<\/strong><\/td><td><strong>3,213<\/strong><\/td><td><strong>1,900<\/strong><\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"h-conclusion\"><span class=\"ez-toc-section\" id=\"Conclusion\"><\/span><strong>Conclusion<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p>The IIM Lucknow RTI Data 2026 for the CAT 2025 cycle for the batch of 2026-28 reveals about the number of candidates who apply for MBA programmes at IIM Lucknow. Based on this data, a total of 236,227 candidates applied for MBA, 182,713 for MBA-ABM, and 184,643 in the MBA-SM, out of which 12,920, 13,912, and 2,995 candidates respectively cleared the Stage 1a qualification criteria. The data also reveals that no vacancy seats were left.\u00a0<\/p>\n\n\n\n<div class=\"wp-block-buttons is-content-justification-center is-layout-flex wp-container-core-buttons-layout-1 wp-block-buttons-is-layout-flex\">\n<div class=\"wp-block-button is-style-shadow\" style=\"margin-bottom:30px\"><a class=\"wp-block-button__link has-vivid-red-background-color has-background wp-element-button\" href=\"https:\/\/www.iquanta.in\/details\/toppers-batch\" style=\"border-radius:30px\">CAT 2026 Toppers Batch<\/a><\/div>\n<\/div>\n\n\n\n<figure class=\"wp-block-image\"><a href=\"https:\/\/www.iquanta.in\/details\/toppers-batch\"><img decoding=\"async\" width=\"1024\" height=\"1024\" src=\"https:\/\/www.iquanta.in\/blog\/wp-content\/uploads\/2026\/10\/image-86-1024x1024.png\" alt=\"\" class=\"wp-image-83044\" srcset=\"https:\/\/www.iquanta.in\/blog\/wp-content\/uploads\/2026\/10\/image-86-1024x1024.png 1024w, https:\/\/www.iquanta.in\/blog\/wp-content\/uploads\/2026\/10\/image-86-300x300.png 300w, https:\/\/www.iquanta.in\/blog\/wp-content\/uploads\/2026\/10\/image-86-150x150.png 150w, https:\/\/www.iquanta.in\/blog\/wp-content\/uploads\/2026\/10\/image-86-768x768.png 768w, https:\/\/www.iquanta.in\/blog\/wp-content\/uploads\/2026\/10\/image-86-420x420.png 420w, https:\/\/www.iquanta.in\/blog\/wp-content\/uploads\/2026\/10\/image-86-696x696.png 696w, https:\/\/www.iquanta.in\/blog\/wp-content\/uploads\/2026\/10\/image-86-1068x1068.png 1068w, https:\/\/www.iquanta.in\/blog\/wp-content\/uploads\/2026\/10\/image-86.png 1254w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure>\n","protected":false},"excerpt":{"rendered":"<p>The IIM Lucknow RTI Data 2026 shared details about the category-wise MBA admission process for the 2026-28 batch based on CAT 2025 scores. The data consists of composite score cutoffs, candidates shortlisted for WAT-PI and more that leads to final admission offers at IIM Lucknow. This data helps the IIM Lucknow MBA aspirants to understand [&hellip;]<\/p>\n","protected":false},"author":560,"featured_media":83325,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[443,331],"tags":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v21.4 (Yoast SEO v21.9.1) - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>IIM Lucknow RTI Data 2026: Composite Score Cutoff, Shortlisted Candidates &amp; More - iQuanta<\/title>\n<meta name=\"description\" content=\"This blog covers IIM Lucknow RTI data. The data consists of composite score cutoffs, candidates shortlisted for WAT-PI, and more that lead to final admission offers at IIM Lucknow.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.iquanta.in\/blog\/iim-lucknow-rti-data-2026\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"IIM Lucknow RTI Data 2026: Composite Score Cutoff, Shortlisted Candidates &amp; More\" \/>\n<meta property=\"og:description\" content=\"This blog covers IIM Lucknow RTI data. The data consists of composite score cutoffs, candidates shortlisted for WAT-PI, and more that lead to final admission offers at IIM Lucknow.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.iquanta.in\/blog\/iim-lucknow-rti-data-2026\/\" \/>\n<meta property=\"og:site_name\" content=\"iQuanta\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/facebook.com\/iquanta.in\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-30T09:33:45+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-30T09:34:05+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.iquanta.in\/blog\/wp-content\/uploads\/2026\/10\/image-123.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1280\" \/>\n\t<meta property=\"og:image:height\" content=\"720\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Nidhi Goswami\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Nidhi Goswami\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"5 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.iquanta.in\/blog\/iim-lucknow-rti-data-2026\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.iquanta.in\/blog\/iim-lucknow-rti-data-2026\/\"},\"author\":{\"name\":\"Nidhi Goswami\",\"@id\":\"https:\/\/www.iquanta.in\/blog\/#\/schema\/person\/ec8c8c25d0526dd86557b6fed064f7f3\"},\"headline\":\"IIM Lucknow RTI Data 2026: Composite Score Cutoff, Shortlisted Candidates &#038; More\",\"datePublished\":\"2026-10-30T09:33:45+00:00\",\"dateModified\":\"2026-10-30T09:34:05+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.iquanta.in\/blog\/iim-lucknow-rti-data-2026\/\"},\"wordCount\":636,\"publisher\":{\"@id\":\"https:\/\/www.iquanta.in\/blog\/#organization\"},\"articleSection\":[\"CAT &amp; Non-CAT\",\"CAT Exam\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.iquanta.in\/blog\/iim-lucknow-rti-data-2026\/\",\"url\":\"https:\/\/www.iquanta.in\/blog\/iim-lucknow-rti-data-2026\/\",\"name\":\"IIM Lucknow RTI Data 2026: Composite Score Cutoff, Shortlisted Candidates & More - iQuanta\",\"isPartOf\":{\"@id\":\"https:\/\/www.iquanta.in\/blog\/#website\"},\"datePublished\":\"2026-10-30T09:33:45+00:00\",\"dateModified\":\"2026-10-30T09:34:05+00:00\",\"description\":\"This blog covers IIM Lucknow RTI data. The data consists of composite score cutoffs, candidates shortlisted for WAT-PI, and more that lead to final admission offers at IIM Lucknow.\",\"breadcrumb\":{\"@id\":\"https:\/\/www.iquanta.in\/blog\/iim-lucknow-rti-data-2026\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.iquanta.in\/blog\/iim-lucknow-rti-data-2026\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.iquanta.in\/blog\/iim-lucknow-rti-data-2026\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.iquanta.in\/blog\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"IIM Lucknow RTI Data 2026: Composite Score Cutoff, Shortlisted Candidates &#038; More\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.iquanta.in\/blog\/#website\",\"url\":\"https:\/\/www.iquanta.in\/blog\/\",\"name\":\"iQuanta | Cat Preparation Online\",\"description\":\"Building Learning Networks\",\"publisher\":{\"@id\":\"https:\/\/www.iquanta.in\/blog\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.iquanta.in\/blog\/?s={search_term_string}\"},\"query-input\":\"required name=search_term_string\"}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.iquanta.in\/blog\/#organization\",\"name\":\"IQuanta\",\"url\":\"https:\/\/www.iquanta.in\/blog\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.iquanta.in\/blog\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.iquanta.in\/blog\/wp-content\/uploads\/2018\/08\/IQuanta-1.png\",\"contentUrl\":\"https:\/\/www.iquanta.in\/blog\/wp-content\/uploads\/2018\/08\/IQuanta-1.png\",\"width\":525,\"height\":200,\"caption\":\"IQuanta\"},\"image\":{\"@id\":\"https:\/\/www.iquanta.in\/blog\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/facebook.com\/iquanta.in\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.iquanta.in\/blog\/#\/schema\/person\/ec8c8c25d0526dd86557b6fed064f7f3\",\"name\":\"Nidhi Goswami\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.iquanta.in\/blog\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/21d234d87afd924b217d26b25a3cf1ee?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/21d234d87afd924b217d26b25a3cf1ee?s=96&d=mm&r=g\",\"caption\":\"Nidhi Goswami\"},\"url\":\"https:\/\/www.iquanta.in\/blog\/author\/nidhigoswami\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"IIM Lucknow RTI Data 2026: Composite Score Cutoff, Shortlisted Candidates & More - iQuanta","description":"This blog covers IIM Lucknow RTI data. The data consists of composite score cutoffs, candidates shortlisted for WAT-PI, and more that lead to final admission offers at IIM Lucknow.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.iquanta.in\/blog\/iim-lucknow-rti-data-2026\/","og_locale":"en_US","og_type":"article","og_title":"IIM Lucknow RTI Data 2026: Composite Score Cutoff, Shortlisted Candidates & More","og_description":"This blog covers IIM Lucknow RTI data. The data consists of composite score cutoffs, candidates shortlisted for WAT-PI, and more that lead to final admission offers at IIM Lucknow.","og_url":"https:\/\/www.iquanta.in\/blog\/iim-lucknow-rti-data-2026\/","og_site_name":"iQuanta","article_publisher":"https:\/\/facebook.com\/iquanta.in","article_published_time":"2026-10-30T09:33:45+00:00","article_modified_time":"2026-10-30T09:34:05+00:00","og_image":[{"width":1280,"height":720,"url":"https:\/\/www.iquanta.in\/blog\/wp-content\/uploads\/2026\/10\/image-123.png","type":"image\/png"}],"author":"Nidhi Goswami","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Nidhi Goswami","Est. reading time":"5 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.iquanta.in\/blog\/iim-lucknow-rti-data-2026\/#article","isPartOf":{"@id":"https:\/\/www.iquanta.in\/blog\/iim-lucknow-rti-data-2026\/"},"author":{"name":"Nidhi Goswami","@id":"https:\/\/www.iquanta.in\/blog\/#\/schema\/person\/ec8c8c25d0526dd86557b6fed064f7f3"},"headline":"IIM Lucknow RTI Data 2026: Composite Score Cutoff, Shortlisted Candidates &#038; More","datePublished":"2026-10-30T09:33:45+00:00","dateModified":"2026-10-30T09:34:05+00:00","mainEntityOfPage":{"@id":"https:\/\/www.iquanta.in\/blog\/iim-lucknow-rti-data-2026\/"},"wordCount":636,"publisher":{"@id":"https:\/\/www.iquanta.in\/blog\/#organization"},"articleSection":["CAT &amp; Non-CAT","CAT Exam"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/www.iquanta.in\/blog\/iim-lucknow-rti-data-2026\/","url":"https:\/\/www.iquanta.in\/blog\/iim-lucknow-rti-data-2026\/","name":"IIM Lucknow RTI Data 2026: Composite Score Cutoff, Shortlisted Candidates & More - iQuanta","isPartOf":{"@id":"https:\/\/www.iquanta.in\/blog\/#website"},"datePublished":"2026-10-30T09:33:45+00:00","dateModified":"2026-10-30T09:34:05+00:00","description":"This blog covers IIM Lucknow RTI data. The data consists of composite score cutoffs, candidates shortlisted for WAT-PI, and more that lead to final admission offers at IIM Lucknow.","breadcrumb":{"@id":"https:\/\/www.iquanta.in\/blog\/iim-lucknow-rti-data-2026\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.iquanta.in\/blog\/iim-lucknow-rti-data-2026\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.iquanta.in\/blog\/iim-lucknow-rti-data-2026\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.iquanta.in\/blog\/"},{"@type":"ListItem","position":2,"name":"IIM Lucknow RTI Data 2026: Composite Score Cutoff, Shortlisted Candidates &#038; More"}]},{"@type":"WebSite","@id":"https:\/\/www.iquanta.in\/blog\/#website","url":"https:\/\/www.iquanta.in\/blog\/","name":"iQuanta | Cat Preparation Online","description":"Building Learning Networks","publisher":{"@id":"https:\/\/www.iquanta.in\/blog\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.iquanta.in\/blog\/?s={search_term_string}"},"query-input":"required name=search_term_string"}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.iquanta.in\/blog\/#organization","name":"IQuanta","url":"https:\/\/www.iquanta.in\/blog\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.iquanta.in\/blog\/#\/schema\/logo\/image\/","url":"https:\/\/www.iquanta.in\/blog\/wp-content\/uploads\/2018\/08\/IQuanta-1.png","contentUrl":"https:\/\/www.iquanta.in\/blog\/wp-content\/uploads\/2018\/08\/IQuanta-1.png","width":525,"height":200,"caption":"IQuanta"},"image":{"@id":"https:\/\/www.iquanta.in\/blog\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/facebook.com\/iquanta.in"]},{"@type":"Person","@id":"https:\/\/www.iquanta.in\/blog\/#\/schema\/person\/ec8c8c25d0526dd86557b6fed064f7f3","name":"Nidhi Goswami","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.iquanta.in\/blog\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/21d234d87afd924b217d26b25a3cf1ee?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/21d234d87afd924b217d26b25a3cf1ee?s=96&d=mm&r=g","caption":"Nidhi Goswami"},"url":"https:\/\/www.iquanta.in\/blog\/author\/nidhigoswami\/"}]}},"_links":{"self":[{"href":"https:\/\/www.iquanta.in\/blog\/wp-json\/wp\/v2\/posts\/83323"}],"collection":[{"href":"https:\/\/www.iquanta.in\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.iquanta.in\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.iquanta.in\/blog\/wp-json\/wp\/v2\/users\/560"}],"replies":[{"embeddable":true,"href":"https:\/\/www.iquanta.in\/blog\/wp-json\/wp\/v2\/comments?post=83323"}],"version-history":[{"count":3,"href":"https:\/\/www.iquanta.in\/blog\/wp-json\/wp\/v2\/posts\/83323\/revisions"}],"predecessor-version":[{"id":83330,"href":"https:\/\/www.iquanta.in\/blog\/wp-json\/wp\/v2\/posts\/83323\/revisions\/83330"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.iquanta.in\/blog\/wp-json\/wp\/v2\/media\/83325"}],"wp:attachment":[{"href":"https:\/\/www.iquanta.in\/blog\/wp-json\/wp\/v2\/media?parent=83323"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.iquanta.in\/blog\/wp-json\/wp\/v2\/categories?post=83323"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.iquanta.in\/blog\/wp-json\/wp\/v2\/tags?post=83323"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}