Better Experience Download iQuanta App

Google Play
App Store
iQuanta Logo

02.cat 2025 paper slot 3 qa

Teams A, B, and C consist of five, eight, and ten members, respectively, such that every member within a team is equally productive. Working separately, teams A, B, and C can complete a certain job in 40 hours, 50 hours, and 4 hours, respectively. Two members from team A, three members from team B, and one member from team C together start the job, and the member from team C leaves after 23 hours. The number of additional member(s) from team B, that would be required to replace the member from team C, to finish the job in the next one hour, is

A.3
B.2
C.4
D.1

Correct Answer

2

Detailed Explanation

Let us assume the per hour productivity of each member from teams A, B, and C be a, b, and c units respectively. Let W be the total units of work that each of the teams does. We have: W = 40 × 5 × a = 50 × 8 × b = 4 × 10 × c This gives us, a = W/200, b = W/400, and c = W/40 Now, when two members from team A, three members from team B, and one member from team C together start the job, total per hour productivity for the first 23 hours will be = 2W/200 + 3W/400 + W/40 = 17W/400 In 23 hours, the work done will be = 23 × 17W/400 = 391W/400 The remaining work, after 23 hours, is W − 391W/400 = 9W/400 The current per hour efficiency of the group that comprises members from only teams A and B, is 2W/200 + 3W/400 = 7W/400 In the next hour, the members from A and B will finish 7W/400 units of work and hence, 9W/400 - 7W/400 = 2W/400 units of work will remain Therefore, the number of additional members required from team B = (2W/400)/(W/400) = 2 members

Video Solution